- ALL
- Paints & Coatings
- Education
- Polymer Additives
- Food & Beverage

Extruder Line Automation Upgrade
Phase wise removal of existing old PLC control panels aged 15 years and above.

Automation Upgrade for 5 GL Blow Molding System
Removal of outdated PLC control panels, which were over 20 years old.

Gas Detection and Alarm Management system
The client required a centralized gas detection and alarm system for a 2 multi-floor building with research labs on each floor.
Testimonials
Inspiring Testimonials from Businesses
Powered by Shel Automation
A very professional service
The installation was done perfectly. After service support was excellent.
We are extremely happy with your Timely response and fast action, regarding the changing of the faulty motor with speed controls in our Band sealer machines, we would like to continue this strong technical support and co-ordination with your company in future as well. All requested documents and data sheets and drawings are well received

Home Importance of UX/UI in SCADA and HMI Screen Development January 16, 2025 • 4 MIN READ User Experience (UX) and User Interface (UI) design are critical components in the development of SCADA (Supervisory Control and Data...

Home Importance of Power Distribution in Control Panel Design Control panels are central to the operation of most electrical systems in industries ranging from manufacturing to renewable energy and beyond. One of the key...

Top 10 Benefits of Implementing SCADA Systems in Your Facility SCADA systems In the modern era, the need to control and monitor real-time operational processes has become imperative. As a solution, our SCADA systems...

Home Industry 4.0 – Are manufacturers ready to take the leap? January 16, 2025 • 4 MIN READ Industrial automation solutions in the UAE There’s a lot said and heard about the Fourth Industrial Revolution, commonly referred...